Civil, mechanical, instrumentation, control, and electrical installation of a 7.2 km gas pipeline for a 414 MW thermoelectric power plant. The pipeline includes excavation and refilling of 40,000 m3, installation of 7.2 km of 12″ Scl 80 pipeline and welding of 8,000 DI, Installation of traps for cleaning pigs, Horizontal Directed Drilling (HDD) at special road crossings, leak testing, pre-commissioning, inerting, and non-destructive testing, installation of instruments for gas measurement, fiber optics, cathodic protection, grounding and feeding of power equipment.Construction of underground electrical conduits, junction boxes, grounding system, and installation of poles for road lighting of the project.Civil, mechanical, electrical and instrumentation, and telecommunications works including Installation of 156 tons of metal structures for the Warehouse Workshop building.Installation of chemical drains and electrical conduits in various areas (area 4, 5A, 5B, 6A, and 6B)November 2022 – in progress
Gas Pipeline for Manzanillo Thermal Power Plant 414MW
Client
Energia 2000
Category
Date
Nov 2022 - In Process