Installation of pipping for the interconnection of 6 tanks in the expansion area, (AC-30, HFO and Diesel). The work includes: Supply, fabrication and installation of HDG support structures, pipe installation, fabrication and installation of heating coils, and hydrostatic testing of the pipping systems.
Haina 2023-2024