We have worked in the electromechanical erection of various hydroelectric projects, among them:
- Rio Blanco Dam in Bonao
- Equalizing reservoir of Moncion
- Los Toros Dam in Azua
- Baiguate Dam in Santiago
Constructora Norberto Odebrecht
Installation of steel shielding of tailrace in the hydroelectric dam Palomino.February 2011 – August 2011…
Feb – Aug 2011
Constructora Norberto Odebrecht
Installation of heavy equipment in the dam area ofthe Palomino hydroelectric project. July 2011 -…
Jul 2011 – Dec 2012
Constructora Norberto Odebrecht
Erection of pennstock. Hydroelectric of Pinalito. Constanza, Dominican Republic. 2006 – 2007…
2006 – 2007
Babcock & Wilcox Española
Mechanical erection of hydroelectric power plant. Los Toros – Dominican Republic, 2000….
2000
Agroman
Electromechanical erection of hydroelectric power plant 2 x 2 MW. Mao (Monción) – Dominican Republic,…
1997
Agroman
Engineering, supply and installation 8 Km., 12.5 KV. transmission line. Mao (Monción) – Dominican Republic,…
1996
CEGELEC
Mechanical erection hydroelectric power plant 2 x 15 MW including penstocks, gates, overhead crane, piping,…
1995-1996
INDRHI
Electromechanical erection 2 x 1 MW hydroelectric power plant including 180 mts. penstock 10 Km…
1993-1994