Installation of mechanical and piping works for the expansion of the existing AES LNG Terminal in Andrés, Boca Chica, Dominican Republic. These works include the prefabrication and erection of 1,200 tons of steel structure in the pipe rack for the new 120,000 M3 LNG storage tank, complete piping works for the new facilities, including 3 hot-tappings (18”,30”,16”) and 70 tie-ins between the new and existing facilities, prefabrication and installation of 80,000 DI of piping for cryogenic, CS, HDPE, and GRP systems. Mechanical installation of 1,424 tons of equipment for the new facilities including 3 cryogenic compressors, construction and mechanical installation of the new Truck Loading station, and installation of outdoor and indoor fire fighting systems. Installation of monorail hoist system in new LNG tank platform, and selected above ground civil works for electrical building and other facilities. Support in commissioning worksWe had over 1,500,000 man hours invested and approximately 1,000 direct personnel during peak activity months.
AES Expansion Project New LNG Tank
Client
POSCO E&C
Category
Date
Nov 2021 – Aug 2024