EPC Gasduct for LNG Conversion of Quisqueya II Power Plant

Client

EGE Haina

Category

Date

Jul 2019 - Jan 2020

EPC contract for the engineering, procurement, construction, and commissioning of the gas duct pipeline between the gas regulation and measurement station and the 12 engines of the Quisqueya II plant with its 225 MW installed capacity. The project consisted of 825 m of API 5L 3LPE pipe of 16″ diameter, underground with two aerial crossings, a filtration-separation station with two Peerless filters of 32″, the cathodic protection system, and the fiber optics between the measuring and regulation station, the filtering station, and the control center of the powerplant.The works included: right-of-way, trenching, alignment and welding, gasket coating, backfilling and covering, hydrostatic testing, drying, filling, and commissioning.San Pedro de Macorís, July 2019 – January 2020.