Installation of 400 mm diameter steel pipeline the connection of the LNG regulation and measurement station and the 12 engines of the Quisqueya I existing power plant. Within our scope of the works was the installation of the filtering station upstream of the Engine Halls.
The works included: right-of-way, trenching, alignment and welding, gasket coating, backfilling and covering, hydrostatic testing, drying, filling and commissioning. The filtration station has 6 FB ball valves and two 28″ Pietro Fiorentini filters.
We also designed, supplied, installed, and commissioned the cathodic protection system for the line.
San Pedro de Macorís – March – June 2019.
Gasduct Pipeline for LNG Gas Conversion of Quisqueya I Generation Plant
Client
Wärtsilä
Category
Date
Mar - Jun 2019