Assembly in modules and installation of 1200 tons of pipe rack structure, with a length of 1,400 meters. Installation of 14,000 meters of pipes of different diameters (18″, 24″, 32″, 36″) and different materials (HDPE, Titanium, SS 316). Pueblo Viejo, DR, June 2021 – 2023.
Gold Mine Expansion Project Package 7
Client
PVDC Barrick
Category
Date
Jun 2021 – 2023