Gold Mine Expansion Project Package 7

Client

PVDC Barrick

Category

,

Date

Jun 2021 – 2023

Assembly in modules and installation of 1200 tons of pipe rack structure, with a length of 1,400 meters. Installation of 14,000 meters of pipes of different diameters (18″, 24″, 32″, 36″) and different materials (HDPE, Titanium, SS 316). Pueblo Viejo, DR, June 2021 – 2023.

Related Projects

Start typing to see posts you are looking for.