Relocation of TSF Dam Pumping System and Tailings Extension

Client

PVDC Barrick

Category

Date

2023

Civil and mechanical works: relocation of two electrical rooms, civil works of foundations, enclosure in cyclonic mesh. Electrical installations: 2.5 km of 34.5kV overhead line, laying and termination of power cables between E-room and the barges. Installation of 14km of 36″, 32″ and 14″ HDPE pipping. Manufacture and installation of two 24″ manifolds in CS. De-installation and re-installation of two floating pumping barges.
Pueblo Viejo 2023