Siba 230MW Power Plant Closing of Combined Cycle

Client

Siba Energy

Category

,

Date

Jun 2024 – In Process

Electromechanical installation for the closure of the combined cycle of the SIBA generation center with 12 turbines to bring total power generation to 230 MW. The works include:

  • Installation of 12 HRSG boilers
  • Installation of “BOP” piping and auxiliary equipment
  • Prefabrication of 603 tons of structures
  • Assembly of 2,251 tons of structures and equipment
  • 22,840 DI welding, on P91 carbon and alloy steel pipe

Cooling Tower Installation 

  • Supply and manufacture of 138 tons of HDG structure
  • Installation of equipment, pipping, filters and fans
  • Supply and fabrication of stairs for access.

June 2024 – in process