Shielding of Tailrace Palomino
Installation of steel shielding of tailrace in the hydroelectric dam Palomino.February 2011 – August 2011
Installation of steel shielding of tailrace in the hydroelectric dam Palomino.February 2011 – August 2011
Installation of heavy equipment in the dam area ofthe Palomino hydroelectric project.
July 2011 – December 2012
Erection of pennstock. Hydroelectric of Pinalito. Constanza, Dominican Republic. 2006 – 2007
Mechanical erection of hydroelectric power plant. Los Toros – Dominican Republic, 2000.
Electromechanical erection of hydroelectric power plant 2 x 2 MW. Mao (Monción) – Dominican Republic, 1997.
Engineering, supply and installation 8 Km., 12.5 KV. transmission line. Mao (Monción) – Dominican Republic, 1996.
Mechanical erection hydroelectric power plant 2 x 15 MW including penstocks, gates, overhead crane, piping, turbine generator and all mechanical erection. Río Blanco – Dominican Republic. 1995-1996.
Electromechanical erection 2 x 1 MW hydroelectric power plant including 180 mts. penstock 10 Km 12.5 KV transmission line and substation. Jánico – Dominican Republic, 1993-1994.