Steel structure Erection
Assembly of 30 ton. prefabricated structure for Central Romana generation plant. Romana, Dominican Republic, 2003.
Assembly of 30 ton. prefabricated structure for Central Romana generation plant. Romana, Dominican Republic, 2003.
Manufacture and installation of 1,400.00 meters of railings for Railway Bridge over the Rio Ozama – Santo Domingo Metro, OPRET.
Major overhaul of civil works at old Yuna River Bridge.
Bonao, DR, March 2011 – January 2012
Contract management, supervision and contractor for the clearence of the roadway interferences between Arroyo Barril and Pueblo Viejo Mine(124 km), to transport the heavy haul extra dimensional equipment including works in medium voltage and power distribution lines, Telephone and cable tV, tree prunning, commercial signs, and traffic lights.Dominican Republic. May 2009 – Dic 2009
Installation of 1,500 meters of hot dipped galvanized pedestrian railings in the Juan Bosh Bridge.
Santo Domingo, DR, May 09 – Aug 09
Fabrication of steel structures, silos and chutes for combined cycle plant in Los Minas, Panama. Nov 08- Aug 09
Repair and maintenance of Manuel Troncoso bridge in Haina, Dominican Republic and repair, maintenance and construction of pedestrian walkway on the bridge over the Soco river. Apr 2008- Sept 2009
Civil works and mechanical erection of 4 pedestrian bridges in Santo Domingo, Dominican Republic. Jan 2008- June 2009
Supply and installation of 4 kms of grating for Las Americas Tunnel. Santo Domingo, Dominican Rep. Jan 08- Apr. 08
Design, supply and erection of a 2,600,000 gallon storage tank for Heavy Fuel Oil. In consortium with Santos CMI.